banner

Products

Hot Rolled Tube GOST 3262-75 Seamless Carbon Steel Pipe

Hot Rolled Tube GOST 3262-75 Seamless Carbon Steel Pipe

1) All standard steel products are stocked, timely shipping as per clients request. 2) Lead time generally about 15-30 w
SHARE

Description

Basic Info
Model NO. Seamless Steel Pipe
Usage Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
Section Shape Round
MOQ 1 Ton
Color Ral Color
Sample Avaliable
Transport Package Standard Sea Worthy Package
Specification Seamless Steel Pipe
Trademark GUOZHONG
Origin China
HS Code 7304192000
Production Capacity 5000tons/Months
Product Description

Hot Rolled Tube GOST 3262-75 Seamless Carbon Steel Pipe

Product TypeCarbon seamless steel pipesMaterialQ195, Q235A-B, Q345A-E, 20#, 10#,16Mn, ASTM A36,ASTM A500,ASTM A53, ASTM 106, SS400, St37, St52, S235JR, S355TRH ect.
GradeASTM A106Gr.B/A53Gr.B, API 5L Gr.B, ST52, ST37, ST44 and so on.Outside Dia10x10 to 600x600mm or as requirement
SizeOD:20-610mm WT: 2-100mm or as clients' requirementWall Thickness0.5 to 25mm or as requirement
Length5.8m, 6m, 11.8m, 12m or as clients' requirementLength5 to 12m or as requirement
PackingBeveled end, painting, caps, plastic woven bagZinc CoatingPre galvanized:40-200g/m²,Hot dipped galvanized:200-550g/m²
TechniqueHot rolled, cold drawn, cold rolledTypeSMLS/Weld/ERW
Price termFOB, CFR, CIFTechniquePaint oil; Varnish; Hot galvanized;Galvanize the raw strip steel; Or according to customer's requirements.
MOQ25 tons.We also can accept sample order.Surface1) Bared 2) Black Painted 3) Galvanized4) Oiled 5) 3PE, FBE ,corrosion resistant coating
Shipment timeWithin 15-20 workdays after receiving deposit or L/CPayment term30% advance, balance before delivery.

Hot Rolled Tube GOST 3262-75 Seamless Carbon Steel Pipe

Hot Rolled Tube GOST 3262-75 Seamless Carbon Steel Pipe

Hot Rolled Tube GOST 3262-75 Seamless Carbon Steel Pipe

Hot Rolled Tube GOST 3262-75 Seamless Carbon Steel Pipe

1) All standard steel products are stocked, timely shipping as per clients request.
2) Lead time generally about 15-30 working days after receiving the deposit.3) Standard export package,suit for all kinds of transport,or as required.
4) If special requirements ,may need longer delivery time.5) Loading port:Qingdao/Shanghai/Tianjin/As required.

Our Contact